BrandSafway (Safway)
SafLock System Scaffold
Documents
Full specifications
| Boiler opening passthrough | 18 in (45.7 cm) | ↗ |
| Finish | Hot-dipped galvanized | ↗ |
| Loose fittings required | None | ↗ |
| Rosette connections | 8 connections per rosette | ↗ |
Every figure is traced to the manufacturer’s published data. ↗ opens the source.
Export for Heyquip
Populate your Heyquip store's product page with this model's specs, images, and cited documents.
Is this your equipment? Verify your specs →