Ir al contenido
Catálogo

Trenching and Shoring

Trenching and shoring pairs the machines that cut trenches with the protective systems that make entering them survivable. Trenchers and hydraulic shores lead the two classes.

144 Modelos3 Tipos Cada especificación citada a la fuente

Cómo funciona

Trenchers cut uniform slots with digging chains; protective systems then either support the soil (shores, slide rail) or shield the workers inside (boxes) once depth passes the protection threshold. Soil classification by a competent person selects the system, and daily inspection keeps it valid.

Tipos y variantes

Shoring
Hydraulic shores, trench boxes, and slide rail protective systems.
Trenchers
Walk-behind and ride-on chain trenchers for utility excavation.

Cómo elegir

The dig selects the trencher — depth, length, soil — and OSHA's excavation framework selects the protection: any trench 5 ft or deeper needs a system chosen by soil type, with engineered design beyond 20 ft. Utility locates precede the cut; competent-person oversight runs throughout.

Normas y certificaciones

OSHA · 29 CFR 1926 Subpart P
Excavation rules; protective systems are required in trenches 5 ft (1.5 m) or deeper.
Common Ground Alliance
Damage-prevention best practices, including 811 notification before any excavation.

Preguntas frecuentes

Does every trench require shoring?
Every trench 5 ft or deeper requires a protective system — shoring, shielding, or sloping — chosen by soil classification, with competent-person judgment governing shallower cuts in questionable ground.
Trencher or excavator for utility work?
The trencher wins on straight, narrow, production runs with minimal spoil; the excavator wins on depth, rock, obstructions, and anything wider than a slot.
What is a competent person in excavation work?
The trained, designated individual who classifies soil, selects protection, inspects daily and after weather, and holds stop-work authority — a named role in the OSHA standard.