Aller au contenu
Catalogue
← Rolling Tower (Baker) Scaffold
CAT CLASS: HQ-10866

12+ ft Rolling Tower (Baker) Scaffold

The 12+ ft Rolling Tower (Baker) Scaffold class comprises three-section and taller configurations with outriggers, engineered for interior work requiring extended vertical reach. Maximum platform heights in this class range from 17 to 27 feet, placing them above the 6-12 ft band for applications where standard two-section towers fall short. All platforms in this size class incorporate stabilizing outriggers to maintain safe geometry as stack height increases.

24
Modèles
5
Marques
Rolling Tower (Baker) Scaffold

Cat classes

Choisissez une classe de taille — la capacité et la portée varient selon la gamme.

Spécifications clés

SpécificationPlage typiqueSignification
Max height17–27 ft (5.2–8.2 m)Platform working height achieved with three or more frame sections stacked and locked.
Frame sections3+Number of individual scaffold frames required to reach the rated height.
OutriggersRequiredLateral stabilizers mandated to offset the increased tip-over risk of tall assemblies.

Comment choisir

The 12+ ft class is appropriate when platform height requirements exceed 12 feet and the workspace permits full outrigger deployment. Jobs demanding reach to ceilings above 14 feet or multi-story interior surfaces fall into this range. For work below 12 feet where ceiling clearance is limited or outriggers cannot be fully extended, the 6-12 ft Rolling Tower (Baker) Scaffold class offers a more compact and stable footprint. No larger size class exists; jobs requiring greater height typically transition to stationary frame scaffolding or aerial lifts.

Ce que cette taille peut gérer

  • HVAC duct installation in warehouses with 20+ ft ceiling heights
  • Electrical conduit runs and junction box mounting in tall lobbies or atriums
  • Interior painting and finishing of mezzanine walls or high ceilings
  • Sprinkler head installation and fire-suppression piping in industrial facilities
  • Light fixture replacement and maintenance in gymnasiums or assembly halls
  • Drywall installation on upper sections of multi-story stairwells

Sécurité et opération

  • Outriggers must be fully extended and locked on level surfaces before climbing; partial deployment significantly increases tip-over risk
  • All four casters must be locked during occupancy; accidental rolling under load is a leading cause of tower failures
  • Maximum occupancy and load ratings decrease as stack height increases; consult frame labels and assembly instructions for each configuration
  • Internal ladder access requires three points of contact; tools and materials should be hoisted separately rather than carried while climbing

Transport et logistique

  • Frame sections and decking typically break down into bundles that fit in standard cargo vans or flatbed trailers
  • Outriggers and casters ship separately; combined load weight and volume usually require a full-size pickup bed or dedicated trailer
  • Multi-section towers often necessitate two trips or a larger trailer to move all components, guardrails, and decking in one haul

Alimentation

  • No onboard power system; scaffold is unpowered structural equipment
  • Work performed from the platform may require extension cords or pneumatic hoses routed from ground-level sources
  • Electrically isolated design allows safe use near live circuits when proper clearances and lockout/tagout procedures are observed

Questions fréquentes

What distinguishes a 12+ ft tower from shorter rolling scaffold classes?
The 12+ ft class uses three or more stacked frame sections and mandates outrigger deployment, whereas 6-12 ft towers typically use two sections and may not require outriggers depending on width and load.
Can a 12+ ft rolling tower be repositioned with workers on the platform?
Industry standards and OSHA regulations prohibit moving rolling scaffolds while occupied. All personnel must descend, outriggers must be retracted, and the tower pushed from the base before re-deploying outriggers and re-boarding.
How does ceiling height affect the choice between a tall rolling tower and stationary scaffolding?
Rolling towers excel in spaces where repositioning is frequent and floor area is unobstructed. When ceiling heights exceed 27 feet or the work zone is confined, stationary frame scaffolding or aerial lifts typically offer greater stability and reach.

Comparer les modèles populaires

Chercher par spécification →

Normalisé aux mêmes unités. Un tiret signifie que la valeur n'a pas été publiée.

ModèleHauteur maxCapacité de charge
Metaltech 12ft Complete Fiberglass Baker Scaffold Tower Set 12 ft (3.7 m)642 lb (291 kg)
Metaltech 18ft Complete Fiberglass Baker Scaffold Tower Set 18 ft (5.5 m)560 lb (254 kg)

Équipements connexes

Parcourir par fabricant

Sources

Chaque spécification est vérifiée par rapport aux données publiées par le fabricant, avec la source liée pour référence.

12+ ft Rolling Tower (Baker) Scaffold

5 modèles · Chaque spécification citée à la source